NEWS

Rok 2023.
Work for PGE Energia Ciepła S.A. Oddział w Krakowie (based on multi-annual contracts):
 
- the same range of works as in the previous years.
 
Work for PGE Energia Ciepła S.A. Oddział w Krakowie (outside multi-annual contracts):
 
• Execution of planned and emergency service works at exhaust gas treatment installation.
 
• Execution of service works, cyclic inspection and modernisation of electrofilters during planned and emergency stops.
 
• Overhaul of the OP-380 No. 1 boiler. and auxiliary equipment of boilers OP 380 No. 1 and 2, OP 430 No. 3 and 4
 
Work for CEZ Skawina S.A.:
- Overhaul of boilers K6 and K11
- Wxecution of works related to recommendations of the Office of Technical Inspection regarding changes in the water heater K-11
- Overhaul of boiler K11
- Delivery and installation of the drain chamber of steam boiler OP-210
- Delivery of drop burners of various types of boiler OP-210
- Carrying out non-destructive testing of the pressure part of the boiler OP-210M No. 11 as part of the internal revision of the Technical Inspection Office.
- Overhaul of boilers (OP-230) K5 and (OP-210M) K10
- Overhaul of auxiliary equipment of boiler OP-210M No. K-10.
 
Other clients:
 
Orlen Południe SA in Trzebina:
Overhaul, preparation of the DN150/125 steam pipeline connecting the 1.5 MW turbine to the manifold for internal revision and recommended repair work and tests ordered by the UDT Inspector at the Trzebinia Energy Department
 
Krakowski Holding Komunalny S.A. w Krakowie:
Execution of an overview and repairs of devices and installations during shutdown at Krakow Garbage Incineration Plant, part 2
 
ABB Sp. z o.o.:
Modernization of technological protections at unit no. 3 in the Combined Heat and Power Plant of PGE PGE EC S.A. No. 1 in Krakow
 
Ethos Energy Poland S.A Lubliniec
Execution of overhaul works within the scope of the overhaul of TG-3 generator in PGE EC S.A. No. 1 in Krakow


 

Rok 2022.
Work for PGE Energia Ciepła S.A. Oddział w Krakowie (based on multi-annual contracts):
 
- the same range of works as in the previous years.
 
Work for PGE Energia Ciepła S.A. Oddział w Krakowie (outside multi-annual contracts):
 
• Modernization of selected elements of auxiliary equipment TG1, TG2, TG3, TG4, district heating and off-site equipment
 
• Overhaul of the OP-380 No. 1 boiler. and auxiliary equipment of boilers OP 380 No. 1 and 2, OP 430 No. 3 and 4
 
Work for CEZ Skawina S.A.:
- Provision of services including: current repairs, troubleshooting and maintenance of production infrastructure (multi-year contract)
- Connecting the technological steam collector to the turbines in CEZ Skawina S.A.
- execution of works as part of the restoration of the K-5 boiler
- Overhaul of K6 and K11 boilers
- Modernization of two steam teats type EP-3-600-4
- execution of works as part of the restoration of the K-6 boiler - recommendations of the Technical Inspection Office
- Replacement of screen panels and flanges for K11 boiler - recommendations of the Technical Inspection Office
- Repair of belt conveyors No. 8A and 8B

2021.
Work for PGE Energia Ciepła S.A. Oddział w Krakowie (based on multi-annual contracts):
 
- the same range of works as in the previous years.
 
Other clients:
 
ZRE Katowice S.A.:
Modernisation of selected parts of the TG1 generator room in PGE EC S.A. Krakow division
 
ABB Sp. z o.o.:
Modernisation of Facility Security Plan technological protection devices of No 1 turboset in PGE EC S.A. Krakow division
 
CEZ Skawina S.A.:
- Overhaul of the K8 air heater and circulation fans
- Connecting the technological steam collector to the turbines in CEZ Skawina S.A.
- Work being part of the K-5 boiler functionality restoring
 
Tauron Serwis Sp. z o.o.:
Execution of an overview and repairs of devices and installations during shutdown at Krakow Garbage Incineration Plant


 

2020.
Work for PGE Energia Ciepła S.A. Oddział w Krakowie (based on multi-annual contracts):
 
• Scheduled and emergency repairs, servicing of the turboset steam boilers, water boilers, oil boilers and their auxiliary equipment. Repairs of electrical and measurement & automation devices.
 
Work for PGE Energia Ciepła S.A. Oddział w Krakowie (outside multi-annual contracts):
 
• Overhaul of the No 4 turboset, devices located in the generator room No 1, and heating equipment.
• Overhaul of the OP-380 No. 2 boiler.
• Repair of the cooling tower No 1 with auxiliary equipment.
• Modernisation of the oil cooling system of the turbosets No 1, 2, 3, 4.
• Manufacturing, delivery and replacement of the 1XW2 heat exchanger casing.
• Repair of the turboset boilers' auxiliary devices.
• Modernisation of the 4WW1, 4WW2 water-water heat exchangers.
• Modernisation of the water installation.
• Servicing air condition and ventilation equipment.
 
Other clients:
 
PGE GiEK S.A. Oddział Elektrownia Bełchatów:
Research project titled: "Development of the innovative technological process of refilling the circulating water system with demineralised water in the exhaust heat recovery installation of the 858MW generator set".
 
ZRE Katowice S.A.:
Works related to an overhaul of the 13UK125 turboset No 2 in PGE EC S.A. Krakow Division.
 
Grupa Powen-Wafapomp SA:
Modernisation of the PC-7, PC-8 cooling water pumps in PGE EC S.A. Krakow Division.


 

2019.
Work for PGE Energia Ciepła S.A. Oddział w Krakowie (based on multi-annual contracts):
 
- the same range of works as in the previous years.
 
Work for PGE Energia Ciepła S.A. Oddział w Krakowie (outside multi-annual contracts):
 
Replacement of the HOB No 2 boiler blower motors
 
Overhaul of hte TG-3 turboset and auxiliary equipment of No 1, 2, 3, 4 generator sets.
 
Modernisation of drives - replacement of coal mill blower motors and whole coal mills of No 3 generator set.
 
Repair of generator set boilers' auxiliary equipment.
 
Installation of the cooling water self-cleaning filters.
 
Repair of the K2, K3, K4 turboset boilers' measurement & automation devices.
 
Execution of planned and emergency service works at exhaust gas treatment installation.
 
Execution of service works, cyclic inspection and modernisation of electrofilters during planned and emergency stops.
 
Modernisation of the wet flue gas desulphurisation installation's flue gas collector through installation of a shut-off flap.
 
Other clients:
 
CEZ Skawina S.A:
 
• Phased replacement of a technological steam collector.
 
• Modernisation of the flue gas desulphurisation installation - electrical and measurement & automation devices.
 
• Expansion of the technological steam installation in a turnkey formula.
 
• Replacement of the K1107 elbow on the fresh steam pipeline.
 
Enrem Połaniec Sp. z o.o: Execution of works on measurement & automation devices within overhaul of the GHH Borsing turbine at the Nowa Sarzyna Power Plant.
 
Ferco S.J: Repair of the high pressure part and auxiliary equipment of the OP-230 type boilers No 5, 6 and OP-210M type No 8 and 9 at the CEZ Skawina Power Plant.
 
IGUS Sp. z o.o.: Modernisation of an overhead crane at the "Czatkowice" limestone mine near Trzebinia.
 
Kopalnia Soli Wieliczka S.A: Repair of a double beam hook gantry, manually operated, 10t lifting capacity, 11m width, with replacement of a rope of a hoist mounted in the pulling machine building of the "Daniłowicz" shaft.
 
Pentol-Enviro Polska Sp. z o.o: Modernisation of the pollution measuring equipment of the KW-5 boiler in PGE EC S.A. Krakow Division

2018. Work for PGE Energia Ciepła S.A. Oddział w Krakowie (based on multi-annual contracts):
 
- the same range of works as in the previous years.
 
Work for PGE Energia Ciepła S.A. Oddział w Krakowie (outside multi-annual contracts):
 
Overhaul of the OP-380 No. 1 boiler.
Overhaul of boiler screening, modernisation of final steam superheater, repair of exhaust ducts and sludge chamber. Work done for Doosan Babcock Energy Polska S.A. from Rybnik
 
Overhaul of the TG1 generator (type TGH-120).
Work done for EthosEnergy Poland S.A. from Lubliniec.
 
Overhaul of the TG1 turbine set with auxiliary equipment, fittings and pipelines.
Work done for the company ZRE Katowice S.A.
 
Other clients:
 
Installation of reduction and cooling station designed for supplying heat exchangers (WP-4, WS-4) and process steam collector with superheated steam.
The reduction and cooling station task is to prepare steam of parameters enabling feeding heat producing devices. Work done for CEZ Skawina S.A. at Skawina power plant facility.
 
Repair of vacum installation covering changing of existing feeding of vacum ejectors of the TG-6 turbine from process steam to fresh steam.
Work done for CEZ Skawina S.A. at Skawina power plant facility.


 

2017. Work for PGE Energia Ciepła S.A. Oddział w Krakowie,
previously EDF Polska S.A. Oddział nr 1 Kraków (based on multi-annual contracts):
 
- the same range of works as in the previous years.
 
Work for PGE Energia Ciepła S.A. Oddział w Krakowie,
previously EDF Polska S.A. Oddział nr 1 Kraków (outside multi-annual contracts):
 
Works on the WP-120 type boiler No. 5
The task goal was to achieve full working order in accordance with the operation and maintenance manual.
The scope of work done in the year 2017:
- supplying and replacement of the upper and lower screen chambers stub-pipes,
- replacement of the furnace chamber walls' panels,
- replacement of endangered pipeline sections,
- diagnostic tests,
- modernisation of inlet and outlet boiler water gate valves,
- modernisation of coal dust ducts, exhaust ducts, coal dust burners,
- modernisation of the WP-120 type water boiler electrofilter. It is dry, horizontal, tri-pole, dual-section type filter,
- modernisation of the WP-120 type boiler oil burners together with fuel feeding fittings. We have done modification of both control and protection circuitry in order to provide efficient boiler startup.
Work done for the company: Energetyka i Recykling Odpadów Sp. z o.o. from Głowno.
 
Works connected with turboset hall overhaul
- modernisation of selected parts of the 13UK125 type TG2 turboset,
- Repair works on the TGH-120 type TG4 generator.
Work done for the company: ZRE Katowice S.A.
 
The TGH-120 type TG4 generator overhaul auxiliary work
- repair of generator excitation circuit,
- execution of all necessary modrnisation and work associated with measurement & automation devices,
- execution of necessary work near generator bearings.
Work done for the company: Ethos Energy Poland S.A. from Lubliniec.
 
Modernisation of coal mill drives (MKM-25 type) for the power unit No. 2
Supplying and replacement of four motors driving the 2MW1-4 coal mills for the power unit No. 2. Replacement of the motors goal was to decrease costs of cola mills' operation, reduction of failure rate, enhancement of servicing safety, and lowering of noise level in the power unit boiler room.
Work done directly for PGE Energia Ciepła S.A. Oddział w Krakowie.
 
Modernisation of selected fittings of the auxiliary heat exchangers of the TG2 (13UK125 type)
Work done directly for PGE Energia Ciepła S.A. Oddział w Krakowie.
 
Other clients:
 
Repair of the R2, R2A cooling water pipelines at Zakład Wytwarzania Kraków
Work done for the company: Tameh Polska Sp. z o.o. from Dąbrowa Górnicza.
 
Periodical inspection of the 2 pcs of 35 B 50 type pumps including servicing and replacing of malfunctioning components of the "Zakrzowek" pumping station in Krakow.
Work done for the company MPEC S.A. from Krakow.
 
Demolition of the TG 4 turbogenerator at Skawina S.A.
Work done for the company: Jezioro Karol "Lehner" from Skawina.


 

2016. Work for EDF Poland SA Branch No. 1 Krakow (based on multi-annual contracts):
 
- constant repair supervision of the turboset and peak-load boiler halls, turboset halls (mechanical, electrical and measurement & automation devices).
- servicing and modernisation of air condition and ventilation equipment.
- maintenance of hoists, servicing and operation of elevators and overhead travelling cranes.
- repair work within the full time duty readiness agreement.
- technical inspection and repair (mechanical and electrical) of diesel and battery-electric trucks (forklifts).
 
Work for EDF Poland SA Branch No. 1 Krakow (outside multi-annual contracts):
 
Modernisation of the high-pressure recuperating exchangers and heat exchangers of the TG-3 turbine set (13UP-110 type).
- internal supervised inspection of the exchangers
- magnetic and ultrosound tests of welded joints
- wall thickness measurement
- dismantling and assembling of the insulation
- supplying, assembling and designing of scaffolding.
 
Repair of the K1 boiler (OP-380 type) coal mills
- disassembling the old mill sieves and assembling the 4 modernised ones.
Work done for the company ZRE Katowice S.A.
 
Installation of additional drives to the existing fittings, allowing remote controlling from the control room.
The first three stages of work included the modernisation of the power units no 3 & 4 - work concluded in 2015 and work on unit no 1 - concluded in 2016.
Work done for the company Doosan Babcock Energy Sp. z o.o. from Rybnik.
 
Other clients:
 
The K11 boiler (OP-201M type) repair work at the CEZ Skawina S.A. power plant.
The range of work included repair of the 1000mm diameter pipelines together with the flaps of the mill-cyclone-separator circuit, consisted of:
- exchange of the 016mm x 10mm - 53m long pipeline together with compensators,
- supplying and replacing of the ZTMA flap - 1 set, material: CREUSABRO 4800.
- assembling and disassembling of the scaffolding necessary for completion of mentioned tasks,
- assembling of thermal insulation.
Work done fo the company ZEC SERVICE S.A. from Wroclaw.
 
Periodical inspection of the 2 pcs of 35 B 50 type pumps including servicing and replacing of malfunctioning components of the "Zakrzowek" pumping station in Krakow.
Work done for the company MPEC S.A. from Krakow.


 

2015. Work for EDF Poland SA Branch No. 1 Krakow:
 
Overhaul of the OP-430 No. 4 boiler.
The scope of work included, inter alia:
- replacement of second run screening,
- repair of condensate drain valves and steam discharge,
- repair of dust ducts,
- overhaul of air ducts,
- modernisation of steam air heaters,
- modernistion of coal mill blowers.
Work has been done for The "Grupa Obsługi Przemysłu BETA Sp. z o.o." company from Ostrołęka.
 
Overhaul of the OP-380 No. 1 and 2 boilers.
The aim of the task was to make the modernisation of selected auxiliary and pressure systems of the OP-380 type boilers. We have modernized dust burners, sludge chamber, dust ducts, condensate drain valves and some of the pressure pipelines. We have done the refurbishment of the boiler drum and the inspection of the combustion chamber anticorrosion coating. The service included associated tasks such as: dismantling of the insulation and construction, dismantling of scaffolding, testing of assembly welds. In addition to the work on boiler No. 2 we have made the exchange of the final steam superheater (task covered by a separate agreement).
 
Modernisation of the K3 and K4 steam boilers (OP-430 type) igniting burners.
Adaptation of the igniting burners of the steam boilers K3 and K4 for light Ekoterm type oil combustion through the exchange of burner lances, lances of the igniters and necessary modernization work of fittings, piping, insulation, power, and the systems controlling the operation of burners. Work has been done for The "Energetyka i Recycling Odpadów Sp. z o.o" company from Głowno.
 
Repair of the TG3 and TG4 (13UP110 type) turbine sets with auxiliary equipment.
Repair work conducted on behalf of the "Zakłady Remontowe Energetyki SA" from Katowice. The scope of repair work on turbine set TG3 and TG4 included, among other things: repair of lube oil coolers, oil coolers seals, hydrogen coolers, starting oil pumps, auxiliary and emergency oil pumps.
Internal inspections (approved by The Office Of Technical Inspection) of the high-pressure and low-pressure recuperating heat exchangers and heat exchangers working in the turbine set TG4 (13UP110 type) technological system we have performed directly on behalf of EDF Poland SA.
 
Modernisation of the No.1 turboset.
On behalf of EDF Poland SA we conducted the modernization of turbine set based on the 13UK125 type of turbine inter alia by the renovation of oil pumps, control system, turbine bearings, turning gears and heat exchangers constituting the No.1 turbine unit. In addition, work included the removal and installation of I & C equipment.
 
Other clients:
 
Repair of the TG6 turbine set for "CEZ Elektrownia Skawina S.A."
At the turn of 2014-2015 we have done a service to the facility of Skawina Power Plant to modernize heat exchangers, auxiliary equipment, valves and pumps within the task: "Modernization of turbine set WK-100-6M installed in Skawina Power Plant as TG-6". The value of the work on this task, covered by four separate contracts, amounted to almost 9.5 million. zł net.


 

2014.Work for EDF Poland SA Branch No. 1 Krakow:
 
Major overhaul of the 13UP110 no TG3 turbine set fittings and piping.
Modernization was to bring devices to full technical efficiency and reduce the failure rate of the block no 3. The aim was also to do inspection and repair of electrical installation and I&C of fittings to adapt it to the needs of new and refurbished drives.
 
Modernization of the the 13UP110 no TG3 turbine condensate filter.
Modernization was to eliminate the impurities present in the water-steam cycle, which, by deposition on the components, cause pollution of the boiler piping system.
 
Modernization of the gas circuit of the TG3 generator (producer: DOLMEL Wroclaw, hydrogen-cooled TGH-120 type).
Modernization was to eliminate the danger of explosion of gas circuit of the TG3 generator (type TGH-120) and bring it to full technical efficiency.
 
Overhaul of the OP-430 No. 3 boiler.
Renovation was to bring pressure part of the boiler and equipment to full workong order in accordance with the operation and maintenance manual. The scope of the overhaul in 2014 included:
- supply and replacement of the third stage steam superheater,
- supply and replacement of the secondary stage steam bulkhead superheater,
- supply and replacement of the ceiling pipes,
- supply and replacement of the second stage injection chillers on the left and right side,
- modernization of the combustion chamber pipes.
 
Modernization of piping and cooling water channels for the units 3 and 4.
Modernization was to implement internal anticorrosion coating of decarbonised cooling water pipes DN 1400, DN 1600 and DN 2000 to protect them from undersediment corrosion, improve throughput and reduce the flow resistance of the cooling water. By limiting factor of scaling, it improved the efficiency of the pipeline (to maintain the nominal value of the flow of water).
 
Adapting peak-boot exchangers XR3 and XR4 to cooperate with the units 1 and 2.
Modernization was to improve the achievement of peak power for the heating system of the city of Krakow.


 

2013. Work for EDF Poland SA Branch No. 1 Krakow:
 
Capitalized overhaul of the unit no 2 heating installation, which is part of the technological line of the power unit BC90 powered by steam from the OP-380 steam boiler.
 
Modernization of drives involving the purchase and replacement of engines for coal mill fan on the power unit No. 2. The subject of this task was the renovation of the radial fan coal mill type 87 WPM / 2.3 for an air pumping in the coal mill - the boiler circuit to the power unit No. 2, which aimed at replacing four medium voltage motors.
 
Capitalized overhaul of the TG2 extraction-condensing type 13 UP 125 turbine set, which is part of the power unit BC90 powered by steam from the OP-380 steam boiler. The purpose of this task was to make the repair of pipelines and fittings installed on turbine set No. 2 to bring the devices to full technical efficiency.
 
Capitalized overhaul of the intermediate pipelines of then high-pressure part of the TG2 extraction-condensing type 13 UP 125 turbine set, which is part of the power unit BC90 powered by steam from the OP-380 steam boiler. The purpose of this task was to make the repair of the intermediate pipelines of the high-pressure part of the turbine connecting the WP control valves chambers with the high-pressure hull. Repair consisted of segmental exchange of the intermediate pipelines.
 
Other clients:
 
Intermediate overhaul of the TG-2 turbine set in Siersza Power Plant, which included:
- repair of water pumps and water systems in the engine room,
- repair of the typ 16CK145 (TG-2) turbine set,
- repair of valves of the TG-6 turbine set,
- removal and installation of the generator rotor of the TG-6 turbine set,
- repair of steam, water and oil circuits of the Unit 6,
(for Tauron Production SA Branch - Siersza Power Plant in Trzebinia)
 
Modernization of the steam boiler OP 380 No. 1 in EDF Poland SA Branch No. 1 Kraków.
The scope of work of this task included the modernization of:
- the evaporator - basic scope,
- the insulation and the boiler armor means,
- air ducts,
- dust ducts,
- drainage collector of superheaters,
- fittings of the condensate drain valve.
(for ROLLMEX Gdynia Sp. z oo - object of EDF Poland SA Branch No. 1 Kraków)


 

2012. Work for EDF "Kraków" S.A.

We continued modrenisation of generators' gas installation with the object of eliminating the danger of explosion. In the year 2012 we had done third phase of works on the generator no. 4.
 
We modernised the K1 OP-380 boiler. The range of works included extension of scaffolding in the furnace chamber necessary for replacement of screening pipes of the left, rear wall and hopper slant, and replacement of screening pipes' panels.
 
We did modernisation of an intermediate recycled steam superheater of the K2 OP-30 boiler.
 
We manufactured and installed prototype installation dosing detergent into heavy oil fuel for the K3 OP-430 boiler burner.
 
We overhauled the K4 OP-430 boiler. The range of works included assembling and disassembling of scaffolding in the boiler furnace chamber, evaporator pipes diagnostics, disassembling of brickwork corner of pulverized coal burners, overhaul of screening pipes' panels, overhaul of deflection screening pipes of pulverized coal burners, overhaul of pulverized coal burners, overhaul of pulverized coal ducts.
 
We modernised devices of the TG 4 turboset (13 U110 type of 107MW electrical power and 190 MW heating power).
 
We also modernised the WP-120 boiler no. 5. The range of works covered delivering and replacement of the horizontal wall screen of the front, rear and side hearth chamber and replacement of convectiv superheater platen pipes.
 
We prepared the unit no. 4 for technical inspection. We carried out inspection of the exchangers interior and pressure tests of exchangers marked: 4XW1(type PWU 550/460), 4 XW2 (type PWU 460/400), 4XW3 (type PWU 460/400), 4XN1(type PN-300), the 4ZZ supply water reservoir (type ZWL - 121), the 4SS vapour cooler (dia. 600, 13 m2), which make up, together with the 13UP110 no. 4 turboset, integral part of the BC100 unit technological line, powered by the OP-430 steam boiler.
 
Other clients:
 
In the year 2012 we took up new task consisting in rental of an boiler room equipment, which supplies the Shenker company buildings and the Złocień housing estate in Carcow. We continuosly supervise the service of boiler devices and we supply and sell heat energy.
 
We also continue to supervise servicing of heat exchengers, boiler rooms and air condition devices in Cracow and Malopolskie province for companies like: EDF "Kraków", Małopolski Urząd Wojewódzki (Małopolska Provincial Office in Krakow), Geofizyka Kraków, Tauron Sprzedaż, Tauron Dystrybucja and others.
 

 


News archives.

Przedsiębiorstwo Remontowo‑Usługowe MEGA-REM Sp. z o.o.
31-587 Kraków, ul. Ciepłownicza 1
 
NIP: 678-002-52-42
Rejestr Przedsiębiorców w Sądzie Rejonowym dla Krakowa-Śródmieścia w Krakowie,
XI Wydział Gospodarczy Krajowego Rejestru Sądowego
Numer KRS: 0000042174 z dnia 07.09.2001
Kapitał zakładowy: 208 500,00 zł